Investor: Goertek Vina Science and Technology Co., Ltd
Location: Que Vo Industrial Park (expanded), Nam Son Commune, Bac Ninh City, Bac Ninh Province
Scope of work:
- Supply and install all 2 connection points including: Isolator, Recloser 22kV
- Supply and install 22kV underground cable from connection point column to 22kV medium voltage cabinet system and 22/0.4kV transformer levels
- Supply and install the whole system of 22kV medium voltage cabinets for 5 substations: Stations 1 & 2, Stations 3 & 4, AE1 Station, AE2 Station, Kios Station 2000kVA.
- Supply and install the whole system of 18 transformers 22 / 0.4kV: 2,500kVA (16 machines), 2,000kVA (1 machine), 1,250kVA (1 machine).
- Supply and install the whole system of 18 low voltage cabinets total 0.4kV.
Construction period: Year 2019-2020